Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
SUN PLANT
2010. 06
10,000Kg/HR
SEOSAN
12kg/㎠
WATER TUBE BOILER
DONGHEE WATR
SEDAI ENERGY & TECHNOLOGY
2010. 04
8,000Kg/HR
DONGDUCHEON
10kg/㎠
SMOKE TUBE BOILER (WASTE HEAT BOILER)
SEHA
2010. 04
8,000Kg/HR
HYENPUNG
15kg/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
MONO-DRUM
GREENSCO
2010. 01
18,000Kg/HR
INCHEON
10kg/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
TUBE REVAMPING
JINRO DISTILLERS
2009. 11
15,000Kg/HR
BANWOL
20㎏/㎠
WATER TUBE BOILER
SUN WOOD
2009. 10
25,000Kg/HR
INCHEON
20㎏/㎠
WATER TUBE BOILER (WASTE WOOD,SAND)
2-DRUM
M.H ETHANOL
2009. 05
18,000Kg/HR
MASAN
10kg/㎠
WATER TUBE BOILER
METHANEINCINERATION
DAEHAN PAPER
2009. 04
3,000Kg/HR
CHEONGJU
10㎏/㎠
WATER TUBE BOILER
METHANEINCINERATION
TAE YOUNG PLANT
2009. 05
4,500Kg/HR
INCHEON
10kg/㎠
SMOKE TUBE BOILER
SUNWOOD
2008. 05
20,000Kg/HR
INCHEON
20kg/㎠
WATER TUBE BOILER (WASTE WOOD)
TUBE REVAMPING
SHINDAE YANG PAPER
2008. 05
40,000Kg/HR
BANWOL
12㎏/㎠
WASTE HEAT BOILER
TUBE REVAMPING
SAMWHA PAPER
2007. 05
30M3/HR
CHEONWON
5㎏/㎠
DEAERATOR
WITH BLOWDOWN TANK
NATURE & PEOPLE
2007.02
10,000Kg/HR
DAMYANG
14㎏/㎠
SMOKE TUBE BOILER
SHIN DAE YANG PAPER
2006. 12
35,000Kg/HR
SIWHA
12㎏/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
CAVITY+3-DRUM
DAN SUK IND
2006. 11
5,000Kg/HR
SIWAH
30㎏/㎠
WATER TUBE BOILER
처음
1
페이지
2
페이지
3
페이지
4
페이지
5
페이지
6
페이지
7
페이지
8
페이지
9
페이지
열린
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색