ENG
Product
Construction Performance (Oversea)
  • 01
    MIF (Constructing Boiler)
    • Started2012.09
    • Completed2013.01
    • Capacity15,000 Kg/HR
    • Pressure10kg/㎠
    • LocationRussia
  • 02
    LET’S (Cyclonic Heat Recovery Boiler)
    • Started2019.07
    • Completed2021.01
    • Capacity3,000/
    • Pressure12kg/㎠
    • LocationJapan Akita
  • 03
    COGENPANAMAJL,S.A
    • Started2019.08
    • Completed2021.12.05
    • Capacity1,000
    • Pressure
    • LocationPanama
  • 04
    Preparing
    • Started
    • Completed
    • Capacity
    • Pressure
    • Location
납품실적(국외) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
COGENPANAMAJL,S.A 2019.08 1,000Kg/HR PANAMA - COMBUSTER SYSTEM
LET’S 2019.07 3,000Kg/HR JAPAN 12kg/㎠ BIOMASS COMBUSTION SYSTEM
LET’S 2018. 08 2.65MW JAPAN 10kg/㎠ WOOD POWER PLANT SUPERHEATER (350DEG.C)
COMPORT 2018. 06 8,000Kg/HR RUSSIA 10kg/㎠ SMOKE TUBE BOILER
KEMATEK 2018. 01 45,000Kg/HR MALAYSIA 40kg/㎠ WATER TUBE BOILER (PARM INCINERATION) SUPERHEATER (250DEG.C)
REDCROSS 2017.12 50Kg/HR CAMBODIA - COMBUSTER
KEMATEK 2017. 09 40,000Kg/HR MALAYSIA 25kg/㎠ WATER TUBE BOILER (PARM INCINERATION) SUPERHEATER (250DEG.C)
INDOHWASEONGUTAMA 2016.12 24,000Kg/HR INDONESIA - EFB CABONIZER
TRILOGYETSPVT 2016. 03 3.4MW SRI LANKA 40kg/㎠ WATER TUBE BOILER
BIOMASSPOWERPLANT 2015. 07 10MW INDONESIA 35kg/㎠ WATER TUBE BOILER
INDOHWASEONGUTAMA 2016. 06 8,000(kg/day) INDONESIA - ACTIVE CARBON
INDOHWASEONGUTAMA 2015. 06 1MW INDONESIA 16kg/㎠ BIOMASS
LETX 2015.03 3,000Kg/HR JAPAN 10kg/㎠ WOOD BOILER SMOKE TUBE TYPE CYLINDRICAL BOILER
INDOHWASEONGUTAMA 2015.03 22T/H INDONESIA - CABONIZERPLANT
TECHNOLOGIESOFCOMFORT 2014. 09 10,000Kg/HR RUSSIA 10kg/㎠ SMOKE TUBE